Skip Navigation Links
Home
Products
Industries
Services
Support
Events
Training
Downloads
About
Contact
Account
Skip Navigation LinksHome > About > Projects
Our Projects
Skip Navigation Links
About
Clients
Projects



NSW RTA Geotechnical Data Management System
Client Roads and Traffic Authority of NSW
Year 2006-2007
Project Outline

Datgel developed a geotechnical data management system and data transfer format for the RTA's Geotechnical section. The system is used by 8 offices and includes:

  • gINT Database
  • Log, Fence, Map and summary lab test reports 
  • AGS format dictionary customised for Australian practice
  • Documentation
  • Training
  • On-going support and maintenance

Ras Laffen Port Expansion Project - Geotechnical Database
Client Jan De Nul Dredging Ltd and Boskalis Westminster Middle East Ltd. / Qatar Petroleum
Year 2006-2007
Project Outline

Upon completion the Ras Laffan port will be the world’s largest energy port. The geotechnical QC testing will involve at least 15000 CPT and 15000 lab tests. Datgel was commissioned in the early stages of construction to develop an in situ and laboratory testing geotechnical data management system. Datgel installed the first version system and trained the lab and engineering personnel in May 2006, and will support and maintain the system for the duration of the project which is due for completion in 2008.

The system incorporates more than 100 database tables, 50 gINT reports and has the following features:

  • Lab testing for soil,aggregates, and quarry products. Twenty tests are supported, all are reported by gINT and most are calculated within the gINT database.
  • In situ testing and sampling
    • CPT – importing GEF data, and parameter calculations
    • Trial Pit/Test Pit
    • Borehole
    • In Situ Density
    • DCP
  • Monitoring – Settlement Markers
  • General Features
    • Lab and field test scheduling
    • Lab sample storage tracking
    • Automatic specification checks
    • Automatic calculation of the natural ground elevation prior to construction
    • User rights and security
    • Coordinate calculation based on chainage, offset and alignment data
    • Site maps
    • Fence diagrams
    • Summary graphs, tables, and histograms
    • Queries and link to excel

Geotechnical Lab and In-Situ Testing Database – New Doha International Airport Reclamation
Client Leeke Associates Ltd /
Joint Venture New Doha International Airport  (Dredging International, Qatar Dredging Company, Royal Boskalis Westminster, Great Lakes Dredging and Dock Company) /
Overseas Bechtel Inc.
Year 2005 - 2007
Project Outline Datgel personnel were the primary gINT / VB.net developers for the Geotechnical Database. The system encompassed:
  • All field, laboratory, monitoring data was stored, calculated, managed and reported by the system. Testing included: CPT, zone load tests, in-situ CBR, in-situ density, boreholes, trial pits, soil classification testing, proctor, lab CBR, vibratory table, direct shear, point load, limited chemical testing, settlement markers, rod settlement gauges, standpipes, and magnetic extensometers.
  • By the end of the project more than 10000 points will be stored within the database system.
  • Numerous time saving tools were setup to streamline the data processing and checking.
  • Database security/user rights were implemented giving some users limited rights to edit data.
  • AGS and database copies of only approved data was automatically sent to the design engineers each day.
  • A custom interface was developed to allow the design engineers to browse and produce PDF gINT reports on the fly.

Riley Consultants NZ Standard gINT Database
Client Riley Consultants - Christchurch, New Zealand
Year 2005 - 2006
Project Outline
  • NZGS 2005 soil, rock and defect component description.
  • Cored borehole log with bar chart strength and weathering.
  • Scalar Penetrometer tables and reporting on logs.
  • Excavation/test pit log.
  • NZGS AGS style database.

Pitt and Sherry Australian Standard gINT Database
Client Pitt and Sherry - Hobart, Australia
Year 2005 - 2006
Project Outline
  • AS1726 soil, rock and defect component description.
  • Cored borehole log 
  • Excavation/test pit log with linked photo and sketch.
  • AGS style database.
  • 1 day training course.